Projects & Case Studies

Groundworks & Civil Engineering Projects Across Scotland

Explore a selection of groundworks, drainage, utility and civil engineering projects completed by Signet Group across Scotland. Our project case studies cover the challenges encountered, works undertaken and completed results across residential, commercial and infrastructure environments.

Featured Project: Retail Civils Works in Bishopbriggs

Signet Group completed a package of external civil engineering works within a live retail environment in Bishopbriggs. The project included large-diameter core drilling, dropped kerb construction, tactile paving and stainless-steel bollard installation.

Location: Bishopbriggs
Environment: Live retail premises
Project type: External civil engineering works
Works completed: Core drilling, dropped kerb, tactile paving and bollard installation

Retail Civils Works – Bishopbriggs

External civil engineering works completed within a live retail environment, including core drilling, dropped kerbs, tactile paving and bollard installation.

New concrete floor slab installed in an outbuilding near Glasgow

Reinforced Concrete Floor Installation – Kirkintilloch

Preparation and installation of a reinforced concrete floor, including excavation, sub-base preparation, reinforcement and concrete placement.

Trial dig excavated to expose foundation

Trial Digs – Denny

Investigative trial digs completed to expose existing underground conditions and provide accurate information ahead of planned works.

Underground drain repair in Falkirk

Drain Repair – Falkirk

Underground drainage repair involving drain tracing, targeted excavation, pipework repair, backfilling and block paving reinstatement.

Drainage Investigation & Gully Works – Drumclog

CCTV drainage investigation carried out in Drumclog to assess the existing underground drainage system and rule out collapsed pipework. Works also included lowering existing gullies to suit the required finished levels.

Concrete Panel Removal & Reinstatement – Edinburgh

Concrete breakout and reinstatement works completed near The Gyle in Edinburgh. The existing concrete panel was broken out and removed, the area prepared, and new concrete installed to provide a durable reinstatement.

Garden Clearance & Utility Duct Installation – Denny

Groundworks completed in Denny including garden clearance, excavation and installation of 2No. 63mm utility ducts. The area was then backfilled and stoned up ready for the next stage of works.

Concrete Slab Removal & Reinstatement – Uddingston

Groundworks completed in Uddingston involving the breakout and removal of an existing concrete slab. The area was excavated as required, backfilled and stoned up to leave a clean and level finish ready for future works.

Project Outcome

The completed works provided the residential property with a properly prepared and reinforced concrete floor. The C25 concrete was placed and finished to form a strong, level and durable surface suitable for the next stage of the property improvements.

Kirkintilloch Reinforced Concrete Floor